The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. the gutter system has been demonstrated in the presentation. The team has been able to complete the prototype that is quite identical to what was designed on Solidworks.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...
-
Electrical components have been configured with different iterations. It will be finalized by the end of the second week of April. Fuses wil...