Week 3: Design Change II (2/8-2/14)
This week, another design iteration which is close to an ideal shape the team was aiming for. The design was to have the standard-sized solar panels attached on top of the supporting structure. Also, less amount of materials will be used for the new design the team has developed.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...
-
Electrical components have been configured with different iterations. It will be finalized by the end of the second week of April. Fuses wil...