Wednesday, February 14, 2018

Week 3: Design Change II (2/8-2/14)

This week, another design iteration which is close to an ideal shape the team was aiming for. The design was to have the standard-sized solar panels attached on top of the supporting structure. Also, less amount of materials will be used for the new design the team has developed.

Wednesday, February 7, 2018

Week 2: Design Change (2/1-2/7)

Our team was required to change the design which includes some new features. We are currently working in changing the support design in an elliptical shape. The team would be incorporating options to make the structure durable and environmentally friendly.

Wednesday, January 31, 2018

Week 1: Spring 2018 (1/25-1/31)

The faculty and advisors of Spartan Superway requested the change in design due to the overall cost reduction in building prototype. As a follow-up, the solar team made a radical design change, which helped the cost to drop a lot.

The supporting structure materials including clamps and straight steel sections were researched again to make the entire structure lighter and cost-efficient. Also, since the length of the one module of the prototype is being shortened, the required number of solar panels will be dropped as well.

I have made a list of things that will be discussed in the full-scale teams meeting with advisors of the Spartan Superway that will be held on January 31st, 2018. One of the factors that have to be confirmed is the width dimension of the entire canopy design as it remained in the midst of confusion.

Tuesday, December 5, 2017

Week 15: Presentation 3

On November 29, 2017, our sub-team has held a presentation on the prospective design draft for solar panels racking system and the truss structure for it. Our group was able to reduce the deflection of the beam that will be in the truss structure down to 6 cm, which is very low compared to the second presentation. Our group needs to find a galvanized steel stud with 10 inches in depth to decrease the deflection of the beam. Also, our team will find out the Bill of Materials for the C shape steel stud, self-drilling screws.

Wednesday, November 8, 2017

Week 10: Lockheed Martin Presentation Preparation

Our team has been preparing the presentation slides for Lockheed Martin Presentation. Also, we are in the process of finalizing our design based on solar panels that are available in our shop. The materials that will be used for the racking system would be sheet metal.

Wednesday, November 1, 2017

Week 9: Second Presentation and Possible Design Change

This week, the team held a presentation with one of the designs for solar panels rack. Dr. Furman provided feedback on what to improve on with our designs as well as what to consider about. The team may change the racking design after consulting with Dr. Furman on 11/1 Wednesday.

Wednesday, October 18, 2017

Week 8: Further Discussion on Design Iterations

This week, each member in the sub-team came up with 2 design iterations. The team is trying to focus on two design iterations created by Tan as well as a design suggested by Nicolas. First type is a shell shape, one of organic shapes, to create an aesthetic design. Paul has demonstrated how to create the shape using Solidworks during the weekly team meeting hours on October 10th Wednesday. The first one is the ideal design the team would like to build. Second iteration is design involving canary. Use cables to make holes on canary to keep the structure in place without using truss structure. Third design, which is brainstormed by Nicolas, focuses on the lightweight of the entire racking system. Wires or cables will be used in across its design, which has an arch shape. This will replace the truss structure as well as increase the ease of installation on top of the guideway.

The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...