Tuesday, December 5, 2017
Week 15: Presentation 3
On November 29, 2017, our sub-team has held a presentation on the prospective design draft for solar panels racking system and the truss structure for it. Our group was able to reduce the deflection of the beam that will be in the truss structure down to 6 cm, which is very low compared to the second presentation. Our group needs to find a galvanized steel stud with 10 inches in depth to decrease the deflection of the beam. Also, our team will find out the Bill of Materials for the C shape steel stud, self-drilling screws.
Subscribe to:
Posts (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Electrical components were learned by the fellow project member, Dan Espinosa, who has had experience in the industry for about 20 years. Co...
-
Tan, Matthew, and myself have conducted energy calculations using the equation in the documents, 2016-06-13.BJF.EnergyCalculation.pdf and Ca...