Friday, May 4, 2018
Week 15: Gutter attaching solution (5/3-5/9)
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be placed between c-channels and solar panels. Solar Clamps and solar panels were attached to c-channels to test the rigidity of the structure. Electrical components assembly and water gutter system will be completed within a week.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Electrical components were learned by the fellow project member, Dan Espinosa, who has had experience in the industry for about 20 years. Co...
-
Tan, Matthew, and myself have conducted energy calculations using the equation in the documents, 2016-06-13.BJF.EnergyCalculation.pdf and Ca...