Friday, May 4, 2018

Week 14: Completion of main structure(4/26 - 5/2)



Longitudinal c-channels were cut to 3 meters and attached to the vertical beam sections using Unistrut's 4-hole 90-degree bracket. Heat shrink with 12 gauge ring terminals, copper wires, were power connector contacts were completed. It was connected to three of 12 volts batteries individually. Solar panels, charge controller, and battery were connected to test the charge controller's condition.







No comments:

Post a Comment

The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...