Week 3: Design Change II (2/8-2/14)
This week, another design iteration which is close to an ideal shape the team was aiming for. The design was to have the standard-sized solar panels attached on top of the supporting structure. Also, less amount of materials will be used for the new design the team has developed.
Wednesday, February 7, 2018
Week 2: Design Change (2/1-2/7)
Our team was required to change the design which includes some new features. We are currently working in changing the support design in an elliptical shape. The team would be incorporating options to make the structure durable and environmentally friendly.
Subscribe to:
Posts (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Longitudinal c-channels were cut to 3 meters and attached to the vertical beam sections using Unistrut's 4-hole 90-degree bracket. H...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...