Wednesday, September 27, 2017
Week 5: Presentation 1
This week, sub-teams for full scale and half scale parts of the Spartan Superway had a presentation. Each team's presentation helped our group to think more into the incorporating the rack design with overall design. I took a note on each team's presentation style, so our team could improve our presentation slides later. Mentors of Spartan Superway and its members gave the team feedback on what to improve and commented on the presentation slides. For our team, we will start working on sketching solar panels design as well as the rack system using Solidworks.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Longitudinal c-channels were cut to 3 meters and attached to the vertical beam sections using Unistrut's 4-hole 90-degree bracket. H...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...