Week 9: Second Presentation and Possible Design Change
This week, the team held a presentation with one of the designs for solar panels rack. Dr. Furman provided feedback on what to improve on with our designs as well as what to consider about. The team may change the racking design after consulting with Dr. Furman on 11/1 Wednesday.