This week, another design iteration which is close to an ideal shape the team was aiming for. The design was to have the standard-sized solar panels attached on top of the supporting structure. Also, less amount of materials will be used for the new design the team has developed.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Electrical components were learned by the fellow project member, Dan Espinosa, who has had experience in the industry for about 20 years. Co...
-
Tan, Matthew, and myself have conducted energy calculations using the equation in the documents, 2016-06-13.BJF.EnergyCalculation.pdf and Ca...