Wednesday, April 4, 2018
Week 10: C-Channels & Solar end clamps handling & Cutting C-Channels & CFD(3/29-4/4)
Throughout the spring break, multiple tasks have been completed. On 3/26/2018, 20 of 26-feet-long U-Haul truck was rented to load and unload the 20-feet-long c-channels from Lord&Sons, Inc. Also, gutter and gutter guards/covers were purchased at Lowe's. On Tuesday, the solar extension cables and solar end clamps were purchased. For the rest of the spring break, the spare scrap metals in the shop were used for practice cutting. Few of straight sections of c-channels have been cut as well. Also, the CFD was conducted using Ansys on solar panels regards to the wind lift encompassing the lift and drag coefficients.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Longitudinal c-channels were cut to 3 meters and attached to the vertical beam sections using Unistrut's 4-hole 90-degree bracket. H...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...