Wednesday, April 11, 2018
Week 12: Presentation 2 on April 11th (4/12 - 4/18)
Presentation 2 was delivered by the solar team on April 11th. CFD results and its hand calculation was advised to be modified. A number of angled cuts of c-channels will be conducted over the weekends. 16Ga sheet metal, which was purchased at Acosta sheet metal manufacturing, will be ordered in the quantities of 24 in the dimensions of 10" by 10". Batteries, charge controllers, parallel y-connectors, extension cables, and MC3 to MC4 converter have been purchased. Wires, gutter, and wooden fake panels will be purchased as well.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Longitudinal c-channels were cut to 3 meters and attached to the vertical beam sections using Unistrut's 4-hole 90-degree bracket. H...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...