Week 6: Bill of Materials & Gutter Design (3/1-3/7)
Different designs of gutter and gutter cover was researched for this week. For the most days, Bill of Materials for all the necessary components for the solar team was completed with comprehensive research. Electrical components were also included in the Bill of Materials with the consideration of different arrangements of solar panels. The budget plan includes a 6m long module of solar panels supporting structure.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
This week, sub-teams for full scale and half scale parts of the Spartan Superway had a presentation. Each team's presentation helped our...