Week 5: Presentation 1 & Design Changes (2/22-2/28)
Presentation 1 was presented on 21st of February, Wednesday. Dr. Furman provided feedbacks on the designs on supporting and gutter structures. Possible methods to accomplish a spherical solar panels placement were advised by Dr. Furman after the presentation. Used solar panels were picked up for free at Cinnamon Solar in Campbell after several phone calls to local solar companies were made. Electrical requirements and the related components were briefly introduced along with manipulations of solar panels arrangements.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
A method to attach the gutter system on solar rack structure was devised. It would allow a constant water flow from the tarps which will be...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Electrical components were learned by the fellow project member, Dan Espinosa, who has had experience in the industry for about 20 years. Co...