Sunday, March 25, 2018
Week 5: Presentation 1 & Design Changes (2/22-2/28)
Presentation 1 was presented on 21st of February, Wednesday. Dr. Furman provided feedbacks on the designs on supporting and gutter structures. Possible methods to accomplish a spherical solar panels placement were advised by Dr. Furman after the presentation. Used solar panels were picked up for free at Cinnamon Solar in Campbell after several phone calls to local solar companies were made. Electrical requirements and the related components were briefly introduced along with manipulations of solar panels arrangements.
Subscribe to:
Post Comments (Atom)
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
The discovery channel has recorded footages of Spartan Superway. Final presentation for full-scale solar team was held in E135 at 11:30 AM. ...
-
Longitudinal c-channels were cut to 3 meters and attached to the vertical beam sections using Unistrut's 4-hole 90-degree bracket. H...
-
The faculty and advisors of Spartan Superway requested the change in design due to the overall cost reduction in building prototype. As a fo...